Explore European Union Legislation by Asking a Legal Question
assisted-checkbox
filter-instruction-1
positive-filters
negative-filters
act-filter tabs-all
parameters-title
query
assisted-checkbox: ✅
result-title
total 2
Regulation (EU) 2023/1804 of the European Parliament and of the Council of 13 September 2023 on the deployment of alternative fuels infrastructure, and repealing Directive 2014/94/EU (Text with EEA relevance) article annex_III CELEX: 32023R1804 Reporting requirements on deployment of electric vehicles and publicly accessible recharging infrastructure
1. Member States must categorise their reporting on the deployment of electric vehicles as follows: — battery electric vehicles, separately for categories M1, N1, M2/3 and N2/3 — plug-in hybrid vehicles, separately for categories M1, N1, M2/3 and N2/3
2. Member States must categorise their reporting on the deployment of publicly accessible recharging points as follows: Category Sub-category Maximum power output Definition pursuant to Article 2 of this Regulation Category 1 (AC) Slow AC recharging point, single-phase P < 7,4 kW Normal-power recharging point Medium-speed AC recharging point, triple-phase 7,4 kW ≤ P ≤ 22 kW Fast AC recharging point, triple-phase P > 22 kW High-power recharging point Category 2 (DC) Slow DC recharging point P < 50 kW Fast DC recharging point 50 kW ≤ P < 150 kW Level 1 - Ultra-fast DC recharging point 150 kW ≤ P < 350 kW Level 2 - Ultra-fast DC recharging point P ≥ 350 kW |
Regulation (EU) 2023/1804 of the European Parliament and of the Council of 13 September 2023 on the deployment of alternative fuels infrastructure, and repealing Directive 2014/94/EU (Text with EEA relevance) article annex_III CELEX: 32023R1804 3. The following data must be provided separately for publicly accessible recharging infrastructure dedicated to light-duty vehicles and heavy-duty vehicles: — number of recharging points, to be reported for each of the categories under point 2; — number of recharging stations, to be reported for each of the categories under point 2; — total aggregated power output of the recharging stations. |